For solar developers and project buyers in Croatia

Land where the grid still has room

Since January 2026 a ground-mounted solar plant can be permitted only on land the law lists, and 48 of 148 HEP ODS substations take no new plants. We find the sites that pass both tests and show what could still stop each one, before you sign an option or pay for studies.

HEP ODS · November 2026Pokupje: more than 20 MW free in the HEP ODS tableSee the sample report ↗
…substations take new plants
…solar sites of 5 ha or more
48substations take no new plants
What a plant of nearly 10 MW costs before it is built
  1. €2,599Our report on the land5 working days
  2. €6-10kEnvironmental screeningabout 8 months
  3. €83kEnergy approval fee to HROTE, 8.327 €/kW15 days after the approval
  4. €70-130kDesign, surveys, lawyers and grid studies (our estimate)1 to 2 years
  5. €1.06MGrid connection fee, at HERA's rates since May 2026when you sign

In 2025, 60 projects with 3.5 GW were stuck on grid rules after their developers had paid €25 million for approvals (PV Europe, 10 June 2025).

Find the problems while they are cheap

A site usually fails on one of three things: the plan does not list the land for solar, too many co-owners to sign, or the substation fills up before you apply. Public records show all three early: the plan, the land register and the HEP ODS tables. Checking them is the first line above.

Check a site first ↗

Which substations still take new plants

Each dot is a substation, coloured by how many megawatts of new plants it takes in the latest HEP ODS table. A closed one can open again when a project in its queue gives up, and we track every edition.

Loading map…

Sites near a substation with room, and what could stop each one

Order a land search and you get every site of 5 ha or more within 10 km of a substation with room, in zones the law lists for solar, checked against the spatial plan, the cadastre, the land register and the HEP ODS tables.

Start a land search ↗
€2,599 per search area

Land search

Name a substation or a municipality. We screen every parcel within 10 km and group them into sites of 5 ha net or more, ordered by how few open questions they have. You get the report as a PDF in 5 working days.

  • Each site with its plan zone and the plan's own words, plus nature, flood, slope, heritage and farm use
  • The land register for the 3 best sites: owners, shares, mortgages
  • How the substation's room changed, how a plant connects, and the connection fee

Each further site with its land register: €150. If the area has no site of 5 ha in a zone the law lists for solar, the fee goes toward another area within 12 months.

Start a search
€490 per project

Land check

Someone offers you land or a project. In 5 working days we tell you what the plan says there, what the land register shows and whether the substation still has room.

Check a project
€199 per month

Monitor

Choose the substations you care about. You hear from us when HEP ODS or HOPS opens or closes room there. Alerts on new environmental screenings and plan hearings nearby are being added during the pilot.

Start a pilot
Free

Who to ask in each county

For each of Croatia's 20 counties and the City of Zagreb: the planning institute, the grid office, the cadastre, the land register court and the permit office, with addresses and phone numbers, in the order you need them.

Open the county pages
Land search

We find the red flags before you pay for studies

For each site the report answers four questions, and says where each answer comes from.

  1. PlanCan solar go here?We check each site against the list of land allowed since January 2026 and against the local plan, and quote the plan's own words.
  2. GridWill the grid connect it, and for how much?How much the substation can take, how that moved in each HEP ODS edition, and the connection fee at today's rates. Right now 48 of 148 substations take no new plants.
  3. OwnersWho owns it?For the best sites we read the land register by hand: owners, shares, mortgages and pending cases.
  4. LandWhat else is in the way?Slope, forest, water, flood maps, Natura 2000 and farmland under subsidy, site by site, on an aerial photo of the land.

Our report on land near the Pokupje substation

Pokupje, HEP ODS edition 9.11.2026

A real report on the land within 10 km of the Pokupje substation near Karlovac. The site with the lightest open questions has a pending plan change that mentions only rooftop solar; three others lie mostly or wholly in Natura 2000. That is what the report is for. Here are 5 of its 41 pages; open one full size.

>20 MWroom on the grid, HEP ODS band D
4sites found, each with its open questions; 12 more closed by the plan
121,306parcels checked within 10 km
Start a land search · €2,599 ↗

The full report has 41 pages. Here parcel numbers and cadastral municipalities are covered. In this sample the land register is not read; in a paid report we read it for the best sites before delivery.

Page 1 of the Pokupje report: DecisionPage 1 of 41 · open full size ↗

Questions buyers ask us

What exactly do I get, and when?
For a land search you get a PDF report, 5 working days after you pay the invoice. Each site of 5 ha net or more comes with its plan zone and the plan's own words, nature, flood, slope, heritage, farm use, the room at the substation and the connection fee. For the 3 best sites we read the land register by hand (owners, shares, mortgages, pending cases), and each further site costs €150. See the Pokupje sample: 41 pages, 7 sites found and 9 more closed by the plan.
What is a search area, and what if it has no site?
A search area is the land within 10 km of one substation that still has room on the grid. You can name the substation, or a municipality, and the free first look then lists the substations with room near it so you can choose one. If the area has no site of 5 ha in a zone the law lists for solar (Zakon o prostornom uređenju, NN 155/25, Art. 19(1) points 41 and 42), the fee goes toward a search in another area ordered within 12 months. A site with open questions, Natura 2000 for example, still counts as a site.
How is this different from the HEP ODS capacity map?
The HEP ODS map shows how much room each substation has today. It does not show which land nearby is in a zone the law lists for solar, what the plan says there, who owns it or what else is in the way. We start from the same tables, add how the room moved in every edition since July 2025, and then work through the land parcel by parcel. The Monitor pilot (€199 a month) tells you when HEP ODS or HOPS opens or closes room at the substations you choose.
Do you reserve grid capacity or promise a permit?
No. The capacity figures HEP ODS publishes are estimates and reserve nothing; only the connection study and the connection contract fix the terms, and room can close before you apply. A permit is the authority's decision, and the report sets out only what the records say and what is still open. Before you commit, confirm zoning with a lokacijska informacija (our county pages name the office that issues it), title with a lawyer and grid terms with the grid operator.
Can you tell me what size plant to build?
No. The size is your decision, made with your designer and the grid operator. For each site the report shows the net land, the room at the substation and the sizes at which the rules change. In our reading of the current rules, from 10 MW a plant needs a building permit and usually connects to HOPS, and from 20 MW the Ministry issues the permits.
Do you contact landowners or the municipality?
No. We never contact owners, municipalities or other authorities, so nobody learns of your interest from us, and we work from public records only. Owner names stay out of the report itself: on request we add them in a separate annex for the parcels of your order, because they are personal data under GDPR.
Will you sell the same sites to another client?
Yes, the same area can be ordered by more than one client, and we do not tell anyone who ordered what. Each order is a fresh check: we run every source again, so your report carries its own date and the state of the plans, the grid and the land register on that date.
Where does the data come from, and how fresh is it?
It comes from public and official sources: spatial plans and their provisions, the cadastre and the land register, the HEP ODS and HOPS capacity tables, the state elevation model and aerial photos, nature, flood and heritage registers, and farm-use records (ARKOD). We check the capacity tables every day and read the land register by hand for your order before delivery. Every figure in the report carries its source and the date we read it, and the report lists what we did not check.
What if the report is wrong?
If a figure does not match its cited source on the cited date, tell us and we correct the report free of charge. A source can itself be out of date or wrong, and a plan provision can often be read more than one way; where it can, the report marks such text as our reading. We do not visit the land, and for ordinary negligence our liability is limited to the price of the report, as our Terms set out.
Can I order only a check of land I was offered?
Yes. The land check costs €490 per project and takes 5 working days. We tell you what the plan says there, what the land register shows and whether the substation still has room. Name the parcels and their cadastral municipality in the form.
How do I pay?
We sell to companies only. We send an offer with our Terms; when you accept it, you give us your company's OIB or VAT number and pay our invoice. Prices exclude VAT, which is charged as the law requires, and the report arrives 5 working days after payment.

Write to us about your project

We never contact owners or authoritiesPrices exclude VAT
  1. Tell us the area and the sizeA county, a municipality, a substation or a parcel you were offered.
  2. We send a free first lookA short note: the substations there with room, how many sites of 5 ha are near them, and the first red flag we see.
  3. You decideOrder the full search or a check, or stop there. We send an offer with our Terms; you pay the invoice and get the report in 5 working days.

Privacy policy

Version 3, 24 November 2026

Who is responsible

Red Cat Labs d.o.o., Ulica Petra Hektorovića 2, Zagreb, Croatia, OIB 00036628211, runs Gridplot and is the controller of the personal data described here. You can reach us by post at that address or through the form on this site. Our full company details are in the Legal notice.

Requests sent through the form

The form asks for your company, the project type and size, the place where you want to build and your e-mail address or phone number. Only the e-mail address or phone number is required. With your request we record the date and time, the version of this policy and whether you asked for news. Cloudflare also tells us the country your connection comes from, based on your IP address. We do not receive the IP address itself.

We use these details to answer you, to send a free first look and to prepare an offer. The legal basis is the steps you ask for before a contract (Art. 6(1)(b) GDPR) and, where you write for a company, our legitimate interest in answering business enquiries (Art. 6(1)(f) GDPR). We use the country to spot misuse of the form and to see where requests come from, which is also our legitimate interest.

We send you news about Gridplot, at most once a month, only if you tick that separate box. The legal basis is your consent (Art. 6(1)(a) GDPR and the Croatian Electronic Communications Act). You can withdraw it at any time by replying to any message or by writing to us.

How your request reaches us

The site runs on Cloudflare (Cloudflare, Inc.). When you send the form, a Cloudflare Pages Function checks it and passes it straight on as a message to our team's chat in Telegram. We do not store the request on the site or at Cloudflare. Only members of our team in that chat can see it.

Telegram is a messaging service of Telegram Messenger Inc., a company established outside the European Economic Area (EEA). Telegram keeps the message on its servers until we delete it. Its privacy policy says that data of users who signed up in the EEA is held in data centres in the Netherlands, but the company that controls those servers is outside the EEA. We therefore treat sending your request to Telegram as a transfer outside the EEA.

This transfer is not covered by an adequacy decision of the European Commission, and we have no data processing agreement or standard contractual clauses with Telegram. Your data may therefore be less well protected than in the EU, and you may find it harder to enforce your rights against Telegram.

We rely on your explicit consent to this transfer (Art. 49(1)(a) GDPR), which you give by ticking the required box in the form. If you do not want your request to go through Telegram, do not use the form. Write to us by post instead.

We delete your request from the chat within 24 months after our last contact with you, or sooner if you ask.

Clients and orders

When your company orders from us, we process the names, roles and business contact details of the people we deal with, the order, our correspondence, invoices and payments. The legal bases are the contract (Art. 6(1)(b) GDPR), our legal duties in accounting and tax (Art. 6(1)(c) GDPR) and our legitimate interest in keeping a record of what we delivered (Art. 6(1)(f) GDPR).

Invoices may pass through an authorised e-invoice intermediary and are reported to the Croatian Tax Administration (Porezna uprava) as the law requires. Monitor alerts go to the contacts you give us.

We keep invoices and accounting records for as long as Croatian accounting and tax law requires. We keep reports, offers and correspondence for 5 years after delivery, so that we can deal with corrections and claims.

Landowners in our reports

When a client orders a report, we read the land register (zemljišne knjige) and the cadastre by hand for the parcels of that order. These public registers show owners' names, addresses and OIB, ownership shares and entries such as mortgages. We read them only for a client's order and we do not run bulk queries.

We use this data only for that order. The report describes the land register entries without naming anyone. Only if the client asks, a separate annex gives the names, addresses and OIB of the owners of the parcels concerned. The legal basis is the legitimate interest of the client and of Red Cat Labs d.o.o. in assessing land for energy projects (Art. 6(1)(f) GDPR). The data comes from public registers, covers only the parcels ordered and is not used for anything else.

We never contact owners, on our own account or on a client's behalf. We do not build databases of owners and we do not collect phone numbers or other contact details. A client that receives the annex becomes a separate controller and may use the data only to assess the land and to buy or lease it (see our Terms of service).

We keep owners' names, addresses and OIB and the land register extracts for 12 months after we deliver the report, and then delete them. We keep the report itself, which names no owners, for 5 years.

We do not inform each owner individually. We hold no contact details for owners and would have to collect more data to reach them (Art. 14(5)(b) GDPR). We publish this policy to inform them instead.

If you own land and object to this use, write to us. We will stop using your data unless we need it to establish, exercise or defend a legal claim.

Visiting the site

When you visit the site, Cloudflare processes your IP address and technical data about your browser to deliver the pages and protect them from attacks. The legal basis is our legitimate interest in running a secure site (Art. 6(1)(f) GDPR). Cloudflare acts as our processor. Where data goes to the United States, it relies on the EU-US Data Privacy Framework.

Cookies and tracking

Necessary, always on: your cookie choice, kept in your browser's local storage under gridplot-consent. The form's protection against bots stores nothing on your device. None of this tracks you.

Statistics and marketing tools run only after you agree to their category. Until then they do not load. The legal basis is your consent (Art. 6(1)(a) GDPR and the Croatian Electronic Communications Act). You can change or withdraw it at any time under "Cookie settings" at the bottom of the page. We then delete these tools' cookies from your browser.

Google may process this data in the United States under the EU-US Data Privacy Framework.

Fonts are served from this site, so no font request goes to a third party.

Who receives your data

We do not sell personal data.

Your rights

You can ask for access to your data, correction, deletion, restriction of processing and a copy to take elsewhere. You can object to processing based on legitimate interest. Where we rely on your consent, you can withdraw it at any time. This does not affect processing that happened before.

Send a letter to our address or use the form on this site. We answer within one month, free of charge. We may ask you to confirm who you are.

We take no decisions about you based solely on automated processing.

You can complain to the Croatian supervisory authority, Agencija za zaštitu osobnih podataka (AZOP), Selska cesta 136, Zagreb, azop.hr.

Changes

We publish changes to this policy on this page, with a new version number and date.

Legal notice

Version 3, 24 November 2026

Service provider

Gridplot is a service of Red Cat Labs d.o.o., a limited liability company (društvo s ograničenom odgovornošću) under Croatian law.

What our reports and alerts are

Reports and alerts supplied under the name Gridplot compile information from public and official sources, processed partly by automated means. Each one states the date on which each source was read and describes that source on that date only.

They are not legal, tax, technical, valuation, surveying or investment advice. They are not a title opinion, an act or opinion of a public authority, or an offer, reservation or commitment of a grid operator. Capacity figures are estimates published by HEP ODS and HOPS and reserve no capacity.

We do not warrant that the sources are complete, current or correct, and we do not check them on site. Where a plan or a regulation can be read in more than one way, the report marks the reading as our own.

Before entering into any binding obligation, obtain a location information (lokacijska informacija) from the competent authority, a lawyer's review of the land register, a survey by a licensed surveyor and the connection terms of the grid operator.

Gridplot never contacts landowners or authorities on a client's behalf. Red Cat Labs d.o.o. is not affiliated with HEP ODS, HOPS or any public authority.

This website

This site describes our services in general terms and is not an offer in the legal sense. What we deliver, and on what terms, is set by a written offer and our Terms of service. Prices are stated exclusive of VAT.

How we handle personal data and cookies is explained in our Privacy policy.

We are not responsible for the content of external sites we link to.

Texts, design and software of this site: © Red Cat Labs d.o.o.

Map data

© OpenStreetMap contributors (ODbL). © ESA WorldCover project 2021, contains modified Copernicus Sentinel data (2021) processed by ESA WorldCover consortium (CC BY 4.0). Global Wind Atlas 4.0, DTU (CC BY 4.0). Elevation model of the State Geodetic Administration, DGU (Otvorena dozvola).

Terms of service

Version 3, 24 November 2026

1. Who we are and who these Terms are for

Gridplot is a service of Red Cat Labs d.o.o., Ulica Petra Hektorovića 2, Zagreb, Croatia, OIB 00036628211 ("we"). Our full company details are in the Legal notice.

We sell only to businesses: companies and other persons who order in the course of their trade or profession. We do not make contracts with consumers. With each order we ask for your company's OIB or VAT number.

These Terms apply to our free first look, to every offer and to every order for Land search, Land check and Monitor.

2. What we do

We help you find and check land near substations with free grid capacity for ground-mounted solar plants in Croatia. Our software screens public and official sources for the area you name. For the sites in your order we read the land register by hand.

A report compiles what public records show. For each figure it gives the source, a public link where one exists, the date we read the source and how we got the figure: copied from the source, calculated by us or read by hand. Where a plan or a regulation can be read in more than one way, the report marks the text as our reading. The report also lists what we did not check.

Reports do not reproduce sheets of spatial plans or images from the ISPU portal. They cite the plan and say what it states. The plan itself is available in its official publication and from the competent authority.

3. What we do not do

We never contact landowners, public authorities or grid operators on your behalf. We do not negotiate for you, we do not act as an agent in land deals and we take no fee linked to a deal. Our price covers our work. It does not depend on the number of sites we find or on any deal you make.

We do not visit the land and we cannot correct errors in public registers.

4. What a report is not

A report is a compilation of public records with sources and dates. It is not legal advice, a title opinion, a valuation, a survey, a design, a permit or other act of a public authority, a grid connection offer or investment advice.

We do not guarantee that a permit will be issued, that grid capacity will still be free when you apply, or that any land can be bought or leased. Capacity figures are estimates published by HEP ODS and HOPS. They reserve nothing. Only the grid operator's connection study and the connection contract fix the terms of a connection.

Before you commit money, confirm the zoning with a location information (lokacijska informacija) from the competent authority, the title with a lawyer's review of the land register, the boundaries with a licensed surveyor and the connection terms with the grid operator.

5. Services and prices

All prices exclude VAT.

The offer states the service, the search area or project, the number of sites with a land register reading, the price and the delivery time. If the offer and these Terms differ, the offer prevails.

6. How a contract is made

You send a request through the form on our site or by e-mail. By ticking the required box in the form you accept these Terms for your request and for our free first look.

We may reply with a free first look, a short note on the area. It is not advice and creates no obligation for either side. We are not liable for it, except for intent or gross negligence.

If you want a report, we send a written offer that refers to these Terms. The contract is made when you accept the offer in writing, by signing it or by confirming it by e-mail. These Terms, in the version named in the offer, then form part of the contract. Your own general terms do not apply unless we accept them in writing.

7. Payment and invoices

We send an invoice when you accept the offer. You pay it before delivery, to the IBAN shown on the invoice and in the Legal notice. Monitor is invoiced monthly in advance.

Prices exclude VAT. We charge VAT as the law requires, including under the reverse charge where it applies. If a tax authority later finds that Croatian VAT was due on a service, you pay that VAT on top of the price.

We issue invoices in the form the law requires, including e-invoices (eRačun) where the Croatian fiscalisation rules apply. Please give us your OIB or VAT number, your billing address and, if you have one, your address for receiving e-invoices.

If you pay late, we may charge statutory default interest and hold delivery until the payment arrives.

8. Delivery

We deliver a Land search or a Land check within 5 working days after your payment reaches us, unless the offer states another time. We deliver electronically.

If a source we need is unavailable, or you have not given us what we need, we tell you and agree a new date with you.

Monitor alerts go to the contact you name. We check the sources regularly, but sources can publish late, change their format or go offline, so an alert can come late. Each alert says what the source showed on the date stated.

9. Monitor pilot

Monitor runs month by month. You can end it at any time, with effect from the end of the month you have paid for.

Because Monitor is a pilot, its features may change. We tell you in writing at least 30 days before we change the price or end the pilot, and you can end Monitor before the change takes effect.

10. Corrections

If a figure in a report or an alert does not match its cited source on the cited date, tell us and we correct it free of charge. Tell us within 12 months of delivery, by post or through the form on this site, and name the figure and the source.

A difference between a source and the situation on the ground, or a change in a source after the cited date, is not an error in the report.

11. Liability

We prepare every report with care. For ordinary negligence our liability is limited to the price you paid for the service concerned. For Monitor it is limited to the fees you paid in the 12 months before the event that caused the loss. We are not liable for indirect loss or lost profit.

These limits do not apply to loss caused by intent or gross negligence, or to any other liability that Croatian law does not allow to be limited (Article 345 of the Civil Obligations Act, Zakon o obveznim odnosima).

Only the company that ordered a report may rely on it. Anyone else, a lender or an investor for example, may rely on it only with our written consent.

12. Your licence to use the report

We keep all rights in our reports, alerts, software and methods. Once you have paid, you receive a non-exclusive, non-transferable licence to use the report within your company, for the project or area in the order.

You may share the report with your own professional advisers who work on that project and are bound by confidentiality. You may not publish or resell the report or use it to build a database.

Map and source data in a report remain under their own licences, which the report lists. Keep their attributions when you use them.

13. Landowner data

Reports describe land register entries without naming owners. Names, addresses and OIB of owners are given only on request, in a separate annex, and only for the parcels of your order.

When you receive this annex you become a separate controller of that data under the GDPR. You may use it only to assess the land and to buy or lease it. You must give the owners the information required by Article 14 GDPR at the latest when you first contact them. You may not pass the data on or compile lists of owners, and you must delete it when you no longer need it for that purpose.

How we handle this data is explained in our Privacy policy.

14. Confidentiality

We keep confidential the fact that you are our client, the area you ask about and the details of your project, unless you agree to disclosure or the law requires it.

Reports compile public records and are not exclusive. We may report on the same area, substations or land for other clients.

15. Changes and notices

We may update these Terms. Each order is governed by the version named in its offer. For Monitor, a new version applies from the month after we tell you about it, and you may end Monitor before then.

We send notices to the e-mail address in the offer. Send yours by post to our address or to the e-mail address we use in the offer.

16. Language, law and courts

These Terms are published in Croatian and English. If the two versions differ, the Croatian version prevails.

Croatian law applies. Disputes go to the court with subject-matter jurisdiction in Zagreb.

Cookie settings

Choose what may run on this site. You can change this at any time with “Cookie settings” at the bottom of the page.

NecessaryAlways on

Remembers your choices on this page and protects the form from bots. No tracking.

Counts visits and shows us which pages people use. Records your IP address, device and browser.

Measures our ads and shows you Gridplot ads on other sites. Shares your IP address and an identifier with advertising networks.